 This job was brought to us by a fellow contractor who wanted us to build the outer shell of this addition. Once it was up and weather-tight, he would complete the interior renovations. "Before" picture of original sunroom and deck during t

This job was brought to us by a fellow contractor who wanted us to build the outer shell of this addition. Once it was up and weather-tight, he would complete the interior renovations. "Before" picture of original sunroom and deck during the initial stages of demolition.

 The original house didn't have a full basement, but the new addition would. This required us to excavate below the foundation of the main house.

The original house didn't have a full basement, but the new addition would. This required us to excavate below the foundation of the main house.

 Set up of forms for poured basement walls

Set up of forms for poured basement walls

 Underpinning forms - since we excavated below the foundation of the existing house, we now needed to support it. This was done by pouring a concrete wall in small sections underneath the existing foundation; each section is tied together w

Underpinning forms - since we excavated below the foundation of the existing house, we now needed to support it. This was done by pouring a concrete wall in small sections underneath the existing foundation; each section is tied together with rebar to make the finished wall a solid unit.

 Basement floor going in; the finished underpinning wall is on the left.

Basement floor going in; the finished underpinning wall is on the left.

 Floor deck installed

Floor deck installed

 Walls going up and roof framing

Walls going up and roof framing

 Basecoat for stucco application

Basecoat for stucco application

 Shot of the finished exterior

Shot of the finished exterior

 Finished shot of the copper porch roof and cupola   

Finished shot of the copper porch roof and cupola

 

 Closer shot of the cupola

Closer shot of the cupola

 Shot of the finished porch

Shot of the finished porch

 Looking across the finished porch

Looking across the finished porch

 Another shot of the finished porch

Another shot of the finished porch

1 2 3 4 5 6 7 8 9 10 11 12 13 14
 This job was brought to us by a fellow contractor who wanted us to build the outer shell of this addition. Once it was up and weather-tight, he would complete the interior renovations. "Before" picture of original sunroom and deck during t
 The original house didn't have a full basement, but the new addition would. This required us to excavate below the foundation of the main house.
 Set up of forms for poured basement walls
 Underpinning forms - since we excavated below the foundation of the existing house, we now needed to support it. This was done by pouring a concrete wall in small sections underneath the existing foundation; each section is tied together w
 Basement floor going in; the finished underpinning wall is on the left.
 Floor deck installed
 Walls going up and roof framing
 Basecoat for stucco application
 Shot of the finished exterior
 Finished shot of the copper porch roof and cupola   
 Closer shot of the cupola
 Shot of the finished porch
 Looking across the finished porch
 Another shot of the finished porch